Global Case Studies

Explore how GS Automatic's energy storage solutions are powering sustainable futures worldwide.

🇨🇭 Switzerland – Nursing Home Microgrid

Client: Swiss Elderly Care Facility

Challenge: Frequent power outages due to aging grid infrastructure, high electricity costs.

Solution: Deployed Ener Hexon® Smart 215 (100kW/215kWh) with automatic grid/off-grid switching. Integrated with PV and diesel backup.

Outcome: 98% uptime, reduced peak demand charges by 40%, zero carbon emissions during operation.

🇳🇱 Netherlands – Agricultural Farm Energy Storage

Client: Organic Farm in Flevoland

Challenge: High energy costs for irrigation pumps and lighting; unreliable grid during storms.

Solution: Installed Ener Hexon® Smart 103P (50kW/103kWh) all-in-one system with 200kW PV array. Off-grid capability activated during outages.

Outcome: 70% reduction in electricity bills, full self-sufficiency during 48-hour blackouts.

🇵🇱 Poland – Factory Green Upgrade

Client: Industrial Manufacturing Plant

Challenge: Carbon tax compliance, unstable voltage affecting production lines.

Solution: Implemented 5MWh Ener Hexon® Aurora5015 containerized system with smart EMS. Peak shaving and voltage stabilization.

Outcome: Achieved ISO 14001 certification, saved €280K/year on energy costs.

🇭🇷 Croatia – Coastal Hotel Zero-Carbon Project

Client: Luxury Beach Resort

Challenge: High seasonal load, dependence on diesel generators, environmental impact.

Solution: Built hybrid microgrid with 300kW PV + 200kWh Ener Hexon® Smart 215 + 100kW EV charger. Solar-powered during day, battery backup at night.

Outcome: 100% renewable energy usage, eliminated diesel consumption, won "Green Tourism Award".

🇪🇬 Egypt – Desert Water Pumping Station

Client: Rural Irrigation Authority

Challenge: No grid access, extreme temperatures (up to 50°C), frequent sandstorms.

Solution: Deployed Ener Hexon® Smart 103P with dual-layer anti-dust design and thermal management. Powered 5km pipeline pumps.

Outcome: Reliable water supply for 500+ farms, no downtime in 2 years, reduced maintenance cost by 60%.

🇳🇬 Nigeria – Urban Hospital Backup Power

Client: Lagos General Hospital

Challenge: Daily power outages lasting 6–12 hours, critical medical equipment failure risk.

Solution: Installed 150kW/300kWh Ener Hexon® Smart 215 with automatic transfer switch. Seamless transition from grid to battery.

Outcome: 100% uptime for ICU and surgery rooms, saved over 100 lives in first year.

🇦🇺 Australia – Mining Site Off-Grid Solution

Client: Gold Mine in Western Australia

Challenge: Remote location, high diesel cost ($1.8/L), limited fuel delivery.

Solution: Built 2MW solar + 1MWh Ener Hexon® Aurora5015 system. Reduced diesel use by 75%.

Outcome: Cut fuel cost by $1.2M/year, increased site efficiency by 30%.

🇨🇦 Canada – Ski Resort Energy Management

Client: Banff Alpine Resort

Challenge: Winter peak demand surge, high tariffs, snow-covered solar panels.

Solution: Installed 200kW/400kWh Ener Hexon® Smart 215 with intelligent snow-clearing algorithm and winter-grade insulation.

Outcome: Saved $350K annually, maintained stable voltage even during storm events.

🇧🇷 Brazil – Rainforest Research Station

Client: Environmental Science Institute

Challenge: No grid access, sensitive scientific instruments require clean power.

Solution: Deployed Ener Hexon® Smart 103P with low-vibration design and EMF shielding. Fully autonomous operation.

Outcome: Continuous data collection for 3 years, zero interference with research.

🇮🇩 Indonesia – Island Community Electrification

Client: Remote Village in Riau Islands

Challenge: No grid connection, diesel generator noise pollution, high cost of living.

Solution: Built mini-microgrid with 50kW PV + 100kWh Ener Hexon® Smart 103P + 30kW wind turbine

Outcome: 24/7 reliable power for 1,200 residents, children can study at night, local economy improved.

🇸🇦 Saudi Arabia – Oil Refinery Emergency Backup

Client: Aramco Subsidiary

Challenge: Critical process interruption risk during grid fluctuations.

Solution: Installed 500kW/1MWh Ener Hexon® Aurora5015 with lightning protection and seismic resistance.

Outcome: Zero production loss in 2024, passed OSHA safety audit with highest score.

🇨🇭 Switzerland – Nursing Home Microgrid

Client: Ho Chi Minh City University

Challenge: Overloaded campus grid, high student demand during exam periods.

Solution: Integrated 300kW/600kWh Ener Hexon® Smart 215 with AI-based load forecasting and dynamic pricing response.

Outcome: Reduced peak load by 45%, saved $180K/year, used as teaching case for engineering students.

0
Inquire for more cooperation or product information.
We will contact you within 1 working day, please check your email.
Name
Mail
Mobile phone
Message
Send

GS Automatic Energy

Get a free quote!
Welcome to GS Automatic Energy. To get a free quote now 🎉

Start Chat with: